Prince George Library: May 3, 2010

This week the site is preparing for the concrete to be poured. The gravel levels out the site. The tubes evident in the pictures are for electrical wiring. Once laid, the gravel will bury them as well.

  

Early next week the site should be covered in concrete and ready for the next big change.