«

»

Prince George Branch Library: May 20, 2010

The concrete foundation is now fifty percent finished. The long machine arm visible in the photos belongs to a concrete pump. The construction staff manuever it by remote control and guide it by hand to direct the flow of concrete into areas desired. Other workers smooth poured concrete with floats to keep it level and flat.

The site has been quieter while the concrete dried. It was an impressive sight to greet those attending the groundbreaking ceremony Friday, May 21st.

Permanent link to this article: http://www.arls.org/2010/05/prince-george-branch-library-may-20-2010/

Leave a Reply

Your email address will not be published.

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>