The good weather brought green leaves, pollen and some big changes to the site. The site is now completely fenced in for safety. These images show why. The excavation for the foundation is underway and the site is very active right now. There are lots of machines, lots of holes and ditches, piles of construction materials , and plenty of mud.

This is now a hardhat zone, but all the exciting activity can be observed from safely behind the fencing. Soon the  footings will be  in place and the building will begin to grow vertically.